Course Structure
Module | Task Name | Duration Days |
---|---|---|
Induction and Orientation | 1 | |
FF-1-E | Fault find basic electrical circuits | 5 |
CO-T | Identify contactors and overloads for various applications | 5 |
DRG | Read and interpret technical drawings. | 4 |
EC-1 | Wire circuits | 5 |
MT-1 | Test a single phase motor | 3 |
SP-T | Explain single phase motors | 3 |
SP-1 | Connect a single phase motor to a power supply | 3 |
FF-2-E | Fault find live electrical circuits | 4 |
MT-2 | Test three-phase motors. | 2 |
SP-2 | Connect a single phase motor to a selector switch | 3 |
SP-3 | Connect a single phase motor to reversing contactors | 3 |
DO-L | Wire a direct-on-line starter | 3 |
PW-3 | Wire a three phase reversing starter | 3 |
PW-2 | Wire sequence starters | 4 |
MO-1-MW | Overhaul a three phase motor | 5 |
OAW-E | Basic welding equipment | 5 |
SD-2 | Wire A Semi-Automatic Star-Delta | 5 |
SD-3 | Wire a Fully Automatic Star-Delta Starter | 5 |
SL-1 | Wire A Resistance Starter To a Slip Ring Motor | 5 |
AT-1 | Wire a Fully Automatic Auto-Transformer Starter | 5 |
PM-T | Explain Pole Changing Motor Theory | 5 |
PM-1 | Connect a Three-Phase Pole changing Motor to a Starter and Selector Switch | 5 |
PM-2 | Connect a Pole Changing motor to Contactors | 5 |
PM-3 | Connect a Pole Changing Motor to a Fully Automatic Starter | 5 |
DC-1 | Connect A Load To A DC Generator | 5 |
DC-2 | Connect A DC Motor And Starter | 5 |
DC-3 | Connect A Ward-Leonard Speed Control | 5 |
PW-4 | Wire A Three-Phase Balanced Load | 5 |
IT-2 | Test a three-phase installation | 5 |
Total Off Site Days | 150 |